RunHaiku 4.5repeat 1
Plan-execute on Run the major-incident runbook for a CI outage
claude-haiku-4-5-20251001__plan-execute__support-major-incident__r1
Score
0.740
- Cost
- $0.159
- Latency
- 3m 6s
- setup 0.0s, grading 0.0s
- Turns
- 40
- Tool calls
- 37
- Subagents
- 0
- Tokens in / out
- 350k / 17k
- 327,584 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- The plan was a plan: heldplan-execute.planThe planner’s reply was read through its schema and held at least one step.
- Each call was shown the right tools: heldplan-execute.toolsThe planner was shown no tools and the executor the task’s full toolset.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Plan | 56.0s | $0.029 | 2 | 0 | claude-haiku-4-5-20251001 |
| Execute | 2m 10s | $0.130 | 38 | 37 | claude-haiku-4-5-20251001 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies plan-execute --tasks support-major-incident --models claude-haiku-4-5-20251001 --repeats 1
Score breakdown
- passAn incident is open for the build pipeline1.00weight 0.04
- passThe incident-command engineer on call now commands the incident1.00weight 0.08
commander=E-401 (expected E-401)
- passThe commander was paged1.00weight 0.04
- passT-3101 linked to the incident1.00weight 0.04
- passT-3101 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T18:52:00Z (expected sev1, 2026-03-30T18:52:00Z)
- passT-3102 linked to the incident1.00weight 0.04
- passT-3102 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T18:58:00Z (expected sev1, 2026-03-30T18:58:00Z)
- passT-3103 linked to the incident1.00weight 0.04
- passT-3103 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T19:01:00Z (expected sev1, 2026-03-30T19:01:00Z)
- passT-3104 linked to the incident1.00weight 0.04
- passT-3104 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-31T15:05:00Z (expected sev1, 2026-03-31T15:05:00Z)
- passT-3105 linked to the incident1.00weight 0.04
- passT-3105 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-04-01T15:07:00Z (expected sev1, 2026-04-01T15:07:00Z)
- passT-3106 linked to the incident1.00weight 0.04
- passT-3106 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=new severity=sev1 due=2026-03-30T16:20:00Z (expected sev1, 2026-03-30T16:20:00Z)
- passT-3109 linked to the incident1.00weight 0.04
- passT-3109 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=new severity=sev1 due=2026-03-30T16:20:00Z (expected sev1, 2026-03-30T16:20:00Z)
- failT-3112 linked to the incident0.00weight 0.04
- failT-3112 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=new severity=unset due=- (expected sev1, 2026-03-30T16:20:00Z)
- failT-3113 linked to the incident0.00weight 0.04
- failT-3113 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=open severity=sev3 due=2026-03-31T15:13:00Z (expected sev1, 2026-03-31T15:13:00Z)
- failT-3114 linked to the incident0.00weight 0.04
- failT-3114 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=open severity=sev3 due=2026-03-31T15:16:00Z (expected sev1, 2026-03-31T15:16:00Z)
- passThe engineer covering comms right now is the communications lead1.00weight 0.08
comms=E-803 (expected E-803)
- passA status update in the runbook form, with the next update due within 30 minutes1.00weight 0.08
- failA postmortem ticket for the service, linked to the incident, due at close of business five business days on0.00weight 0.08
T-3115 due=2026-04-07T17:00:00Z
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 37
- failed tool calls
- 0
- distinct tools
- 18
Final answer
MAJOR INCIDENT RESPONSE COMPLETE
I have successfully taken charge of the company-wide build pipeline outage and established incident command following KB-40 (the binding major-incident runbook). Here's what has been accomplished:
Incident Established: INC-1
- Title: Build pipeline infrastructure failure: no runners available
- Service: build-pipeline
- Status: Active (opened 2026-03-30T15:20:00Z)
Command Structure Activated
Incident Commander: E-401 Priya Raman
- Paged immediately at 15:20 UTC (page delivered without delay)
- On call until 16:00 UTC, successor E-402 will cover escalations after
Communications Lead: E-803 Elif Demir
- Assigned from backup rotation (comms-secondary) per handbook policy
- Primary (E-801) is on sick leave today and cannot hold incident roles
- On call until 20:00 UTC
Outage Reports Triaged & Consolidated
All 7 open reports of this outage linked to INC-1:
- T-3101: All CI builds failing: no runners available (first report, 14:52 UTC)
- T-3102: Mobile builds stuck in the queue
- T-3103: Pipeline never starts
- T-3104: Builds hang at "waiting for runner"
- T-3105: Cannot trigger a build for my branch
- T-3106: CI completely down (automated alert)
- T-3109: Release pipeline blocked: no runners
All escalated to sev1 (company-wide impact per escalation matrix), with deadlines committed per response targets.
Postmortem Scheduled
- T-3115: Postmortem due 2026-04-07T17:00:00Z (5 business days, accounting for Good Friday 04-03 and Easter Monday 04-06)
Status Updates Active
- First update posted: "Impact: Company-wide CI outage - all build pipelines down, no runners available. Started: 14:52 UTC. Next update: 15:50 UTC."
- Next update due in 30 minutes per runbook requirements
The incident is now fully operationalized with proper escalation routing, dedicated incident leadership, and continuous status communication to the company.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.