ScaffoldBench

RunOpus 5.5repeat 2

Plan-execute-verify on Share two short deliveries out among backorders

claude-opus-5-5__plan-execute-verify__ecommerce-backorder-allocation__r2

Score

1.000

passed
design ran as designed
Cost
$0.755
Latency
2m 45s
setup 0.0s, grading 0.0s
Turns
118
Tool calls
113
Subagents
0
Tokens in / out
522k / 17k
477,461 read from cache

Did the design run?

every check held
  • Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
  • No API failures: heldharness.apiNo model call failed at the API.
  • Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
  • No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
  • Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
  • No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
  • Builtin tools: heldharness.builtin-toolsA check recorded with the run.
  • Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
  • No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
  • The plan was a plan: heldplan-execute-verify.planThe planner’s reply was read through its schema and held at least one step.
  • Every verdict was read: heldplan-execute-verify.verdictsEvery review round ended with a verdict read from the schema reply, not a default.
  • The loop did what its verdicts said: heldplan-execute-verify.loopEvery verdict that called for a revision got one, and nothing was revised without such a verdict.
  • Each call was shown the right tools: heldplan-execute-verify.toolsThe planner was shown no tools, the verifier the read-only ones, and the executor and reviser the full toolset.

Phases

Plan: 0.0s to 20.9s, finished, 0 tool calls, $0.040
Execute: 20.9s to 2m 9s, finished, 79 tool calls, $0.494
Verify: 2m 9s to 2m 45s, finished, 34 tool calls, $0.221

Drawn from the phase records: timing and cost per call, no tool calls or messages.

PhaseDurationCostTurnsToolsModel
Plan20.9s$0.04020claude-opus-5-5
Execute1m 48s$0.4948079claude-opus-5-5
Verify36.3s$0.2213634claude-opus-5-5

The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.

Runs you can replay

Record this cell yourself: npm run bench -- run --strategies plan-execute-verify --tasks ecommerce-backorder-allocation --models claude-opus-5-5 --repeats 1

Score breakdown

  • passO-5201 allocated from the delivery
    1.00weight 0.05

    L1=pending

  • passO-5201: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5202 allocated from the delivery
    1.00weight 0.05

    L1=pending L2=pending

  • passO-5202: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5203 allocated from the delivery
    1.00weight 0.05

    L1=pending

  • passO-5203: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5204 allocated from the delivery
    1.00weight 0.05

    L1=pending

  • passO-5204: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5206 left waiting, with a promise date
    1.00weight 0.05

    L1=backordered@2026-08-14 L2=backordered@2026-08-14 L3=pending

  • passO-5206 waiting lines promised for the date the in-transit supply gives them
    1.00weight 0.03

    expected L1@2026-08-14, L2@2026-08-14

  • passO-5206: customer told once, with the promised date
    1.00weight 0.01
  • passO-5207 allocated from the delivery
    1.00weight 0.05

    L1=pending L2=pending

  • passO-5207: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5208 allocated from the delivery
    1.00weight 0.05

    L1=pending

  • passO-5208: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5209 allocated from the delivery
    1.00weight 0.05

    L1=pending

  • passO-5209: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5210 allocated from the delivery
    1.00weight 0.05

    L1=pending L2=pending

  • passO-5210: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5211 allocated from the delivery
    1.00weight 0.05

    L1=pending L2=shipped

  • passO-5211: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5212 allocated from the delivery
    1.00weight 0.05

    L1=pending

  • passO-5212: customer told once that the order is allocated
    1.00weight 0.01
  • passO-5213 left waiting, with a promise date
    1.00weight 0.05

    L1=backordered@2026-08-14

  • passO-5213 waiting lines promised for the date the in-transit supply gives them
    1.00weight 0.03

    expected L1@2026-08-14

  • passO-5213: customer told once, with the promised date
    1.00weight 0.01
  • passO-5214 left waiting, with a promise date
    1.00weight 0.05

    L1=backordered@2026-08-19

  • passO-5214 waiting lines promised for the date the in-transit supply gives them
    1.00weight 0.03

    expected L1@2026-08-19

  • passO-5214: customer told once, with the promised date
    1.00weight 0.01
  • passO-5215 allocated from the delivery
    1.00weight 0.05

    L1=pending

  • passO-5215: customer told once that the order is allocated
    1.00weight 0.01
  • passBoth deliveries were allocated in full
    1.00weight 0.03

    P-DOC stock=0, P-MON stock=0

Penalties

No penalties were applied.

Scorer metadata

tool calls
113
failed tool calls
0
distinct tools
11

Final answer

I've worked all the dock (P-DOC) and monitor (P-MON) backorders: 14 lines now have stock and 4 have promise dates. One order on risk hold was left alone, and every other customer got one notice.

I did more than the request covered. Two more supplier deliveries were recorded as received while I was working: PO-91 (4 docks) and PO-93 (3 monitors). The handbook says received supplier stock goes to waiting backorders in priority order. So I gave those units out under the same rules instead of promising lines a date from deliveries that had already arrived. Both products are now at 0 in stock.

Rules applied:

  • Date: the store's system gives today as 2026-07-25, not 2026-10-06, so I used its date.
  • PU-12 applies: orders placed on or before 2026-07-11 (14 or more days old) go first, oldest first, whatever the tier. Everything else goes by tier (platinum, gold, standard), then earliest order.
  • PU-9 doesn't apply: it only covered June.
  • Received quantities: PO-88 was 7 docks and PO-89 was 4 monitors, as you said.

Lines allocated (ready to ship)

  • Docks: O-5201 L1 (2), O-5202 L2 (1), O-5204 L1 (2), O-5207 L1 (1), O-5210 L1 (1), then from PO-91: O-5209 L1 (2), O-5211 L1 (1), O-5215 L1 (1).
  • Monitors: O-5202 L1 (1), O-5203 L1 (2), O-5207 L2 (1), then from PO-93: O-5208 L1 (2), O-5212 L1 (1).
  • O-5207: this order must ship complete, and both of its lines could be filled at once, so both were allocated.
  • O-5213: it was skipped when only 1 dock was left because it needs 2. O-5215 took that last unit.

Lines still waiting, with promise dates

  • O-5206: must ship complete, and its USB-C hub line (L2) has no stock, so it was not allocated. The dock line would come from PO-95 on 2026-08-14 and the hub from PO-90 on 2026-08-06. Both lines are promised for the later date, 2026-08-14.
  • O-5213 L1 (2 docks): 2026-08-14, from PO-95.
  • O-5214 L1 (1 monitor): 2026-08-19, from PO-97.

There's enough stock in transit to cover every waiting line.

Skipped: O-5205 (1 dock) is on risk hold, so it got no stock, no promise date and no notice.

Notices: one each was sent for O-5201, 5202, 5203, 5204, 5206, 5207, 5208, 5209, 5210, 5211, 5212, 5213, 5214 and 5215. I didn't change any other order, line or product.

Provenance of the numbers on this page

run set
scaffold-or-scale-v1
models
Haiku 4.5, Sonnet 5.5, Opus 5.5
effort
high
repeats
2
fixtures
replay
runs
900 / 900
strategy cost
$354.44
judge cost
$9.19
wall clock
9h 48m
git
fce5807b2d

Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.