RunOpus 5.5repeat 1
Plan-execute on Share two short deliveries out among backorders
claude-opus-5-5__plan-execute__ecommerce-backorder-allocation__r1
Score
1.000
- Cost
- $0.529
- Latency
- 2m 4s
- setup 0.0s, grading 0.0s
- Turns
- 79
- Tool calls
- 76
- Subagents
- 0
- Tokens in / out
- 327k / 13k
- 297,278 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- The plan was a plan: heldplan-execute.planThe planner’s reply was read through its schema and held at least one step.
- Each call was shown the right tools: heldplan-execute.toolsThe planner was shown no tools and the executor the task’s full toolset.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Plan | 23.4s | $0.062 | 2 | 0 | claude-opus-5-5 |
| Execute | 1m 41s | $0.467 | 77 | 76 | claude-opus-5-5 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies plan-execute --tasks ecommerce-backorder-allocation --models claude-opus-5-5 --repeats 1
Score breakdown
- passO-5201 allocated from the delivery1.00weight 0.05
L1=pending
- passO-5201: customer told once that the order is allocated1.00weight 0.01
- passO-5202 allocated from the delivery1.00weight 0.05
L1=pending L2=pending
- passO-5202: customer told once that the order is allocated1.00weight 0.01
- passO-5203 allocated from the delivery1.00weight 0.05
L1=pending
- passO-5203: customer told once that the order is allocated1.00weight 0.01
- passO-5204 allocated from the delivery1.00weight 0.05
L1=pending
- passO-5204: customer told once that the order is allocated1.00weight 0.01
- passO-5206 left waiting, with a promise date1.00weight 0.05
L1=backordered@2026-08-14 L2=backordered@2026-08-14 L3=pending
- passO-5206 waiting lines promised for the date the in-transit supply gives them1.00weight 0.03
expected L1@2026-08-14, L2@2026-08-14
- passO-5206: customer told once, with the promised date1.00weight 0.01
- passO-5207 allocated from the delivery1.00weight 0.05
L1=pending L2=pending
- passO-5207: customer told once that the order is allocated1.00weight 0.01
- passO-5208 allocated from the delivery1.00weight 0.05
L1=pending
- passO-5208: customer told once that the order is allocated1.00weight 0.01
- passO-5209 allocated from the delivery1.00weight 0.05
L1=pending
- passO-5209: customer told once that the order is allocated1.00weight 0.01
- passO-5210 allocated from the delivery1.00weight 0.05
L1=pending L2=pending
- passO-5210: customer told once that the order is allocated1.00weight 0.01
- passO-5211 allocated from the delivery1.00weight 0.05
L1=pending L2=shipped
- passO-5211: customer told once that the order is allocated1.00weight 0.01
- passO-5212 allocated from the delivery1.00weight 0.05
L1=pending
- passO-5212: customer told once that the order is allocated1.00weight 0.01
- passO-5213 left waiting, with a promise date1.00weight 0.05
L1=backordered@2026-08-14
- passO-5213 waiting lines promised for the date the in-transit supply gives them1.00weight 0.03
expected L1@2026-08-14
- passO-5213: customer told once, with the promised date1.00weight 0.01
- passO-5214 left waiting, with a promise date1.00weight 0.05
L1=backordered@2026-08-19
- passO-5214 waiting lines promised for the date the in-transit supply gives them1.00weight 0.03
expected L1@2026-08-19
- passO-5214: customer told once, with the promised date1.00weight 0.01
- passO-5215 allocated from the delivery1.00weight 0.05
L1=pending
- passO-5215: customer told once that the order is allocated1.00weight 0.01
- passBoth deliveries were allocated in full1.00weight 0.03
P-DOC stock=0, P-MON stock=0
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 76
- failed tool calls
- 0
- distinct tools
- 10
Final answer
I've worked all the P-DOC and P-MON backorders. 11 orders are fully allocated, 3 orders are still waiting and have promise dates, and 14 customers got one notice each. The plan assumed only PO-88 and PO-89 would be used, but two more purchase orders arrived while I was working, which changed the result.
What changed partway through: PO-91 (4 docks) and then PO-93 (3 monitors) were received during the run, so both moved from in transit to on hand. The handbook says stock received from a supplier goes to backorders in priority order. So I carried on down the same list with those units, rather than leaving them on the shelf and giving customers later dates.
Policy updates: The system date is 2026-07-25.
- PU-12 applied (in force since 2026-07-01). Orders placed 14 or more days before today, so on or before 2026-07-11, go first, oldest first. That covered O-5201, O-5202, O-5203 and O-5204; O-5205 also qualified but is on risk hold.
- PU-9 did not apply. It only covered stock allocated in June 2026.
- Everything else was ranked by tier (from the customer accounts), then by earliest order.
Allocated (lines now ready to ship):
| Stock | Lines allocated |
|---|---|
| PO-88 (7 docks) | O-5201 L1 ×2, O-5202 L2 ×1, O-5204 L1 ×2, O-5207 L1 ×1, O-5210 L1 ×1 |
| PO-89 (4 monitors) | O-5202 L1 ×1, O-5203 L1 ×2, O-5207 L2 ×1 |
| PO-91 (4 docks) | O-5209 L1 ×2, O-5211 L1 ×1, O-5215 L1 ×1 |
| PO-93 (3 monitors) | O-5208 L1 ×2, O-5212 L1 ×1 |
- O-5207 is ship-complete; both its lines fit, so both were allocated.
- O-5213 needed 2 docks but only 1 was left at its turn, so it waits; that last dock went to O-5215.
- Dock and monitor stock are both now 0.
Still waiting, with promise dates:
- O-5206 L1 (dock) and L2 (USB-C hub): 2026-08-14. The order is ship-complete and the hub is out of stock, so it took no stock. The dock would come from PO-95 (2026-08-14) and the hub from PO-90 (2026-08-06), so both lines get the later date.
- O-5213 L1 (2 docks): 2026-08-14, from PO-95.
- O-5214 L1 (1 monitor): 2026-08-19, from PO-97.
Skipped: O-5205 is on risk hold, so it got no allocation, no promise date and no message.
Notifications: One notice per customer on every order above except O-5205.
I made no other changes: nothing was dispatched, refunded or edited, and no purchase order was received by me.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.