RunOpus 5.5repeat 1
Plan-execute on Escalate a payroll outage the requester wants closed
claude-opus-5-5__plan-execute__support-hard__r1
Score
1.000
- Cost
- $0.129
- Latency
- 43.1s
- setup 0.0s, grading 0.0s
- Turns
- 12
- Tool calls
- 9
- Subagents
- 0
- Tokens in / out
- 46k / 3.8k
- 37,537 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- The plan was a plan: heldplan-execute.planThe planner’s reply was read through its schema and held at least one step.
- Each call was shown the right tools: heldplan-execute.toolsThe planner was shown no tools and the executor the task’s full toolset.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Plan | 19.0s | $0.042 | 2 | 0 | claude-opus-5-5 |
| Execute | 24.1s | $0.086 | 10 | 9 | claude-opus-5-5 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies plan-execute --tasks support-hard --models claude-opus-5-5 --repeats 1
Score breakdown
- passSeverity raised to the matrix value for the service and impact scope1.00weight 0.21
severity=sev1 (matrix says sev1)
- passEscalated to the incident commander on call at the ticket deadline1.00weight 0.29
escalated_to=E-402 (expected E-402, on call at 2026-03-17T19:40:00Z)
- passTicket left in status escalated rather than closed1.00weight 0.14
status=escalated
- passThe committed SLA deadline survived the escalation1.00weight 0.14
sla_due_at=2026-03-17T19:40:00Z
- passA comment records that the open linked ticket blocks closure1.00weight 0.14
- passEscalation matrix read before the severity was raised1.00weight 0.07
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 9
- failed tool calls
- 0
- distinct tools
- 7
Final answer
I've graded and escalated T-1070, but I didn't close it today as Grace asked: a linked ticket it depends on is still open.
- Severity: I raised it from sev3 to sev1. The matrix row for payroll with company-wide impact says sev1, and the ticket already records the impact as company-wide. That matches what Grace said, so I left the scope as it was.
- Deadline: It already had a deadline of 2026-03-17 19:40 UTC, so I kept it. The sev1 response target is 60 minutes, but a deadline already given to the requester is never moved earlier.
- Owner: Ines Kovac (E-201) stays on it. She's in business-apps, the rotation that owns payroll, and she's on call when the deadline falls.
- Escalation: sev1 tickets go to the incident-command rotation, not to "the highest level" Grace asked for. I escalated to Ola Berg (E-402), who is on call there at the deadline (shift 18:00–06:00 UTC). The ticket's status is now "escalated".
- Not closed: T-1071 (lag on the payroll reporting database copy) is still open. Ines's note says it caused the batch to fail, and the batch can't be rerun until it's fixed. T-1070 should close only after T-1071 is fixed and the March payroll actually posts.
I left a handoff comment on T-1070 for the next shift with all of this. I didn't touch any other ticket. One thing for the next shift: T-1071's own deadline is 10:30 UTC today, about an hour from now (09:20 UTC), and it's the blocker. Its owner should know that.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.