RunOpus 5.5repeat 1
Propose-select on Return an expired, partially shipped order
claude-opus-5-5__propose-select__ecommerce-hard__r1
Score
1.000
- Cost
- $0.379
- Latency
- 1m 11s
- setup 0.0s, grading 0.0s
- Turns
- 33
- Tool calls
- 27
- Subagents
- 3
- Tokens in / out
- 89k / 11k
- 60,698 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- All three proposers ran: heldpropose-select.proposalsThree proposers ran in parallel, each from its own angle, and none was starved while another ran.
- The selector chose: heldpropose-select.selectionThe selector picked a proposal by a valid number, read from its schema reply and not a default.
- Each call was shown the right tools: heldpropose-select.toolsEach proposer was shown the read-only tools, the selector none, and the executor the full toolset.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Proposal 1 (policy-first) | 21.3s | $0.061 | 7 | 6 | claude-opus-5-5 |
| Proposal 2 (state-first) | 24.0s | $0.064 | 7 | 6 | claude-opus-5-5 |
| Proposal 3 (outcome-first) | 26.5s | $0.065 | 7 | 6 | claude-opus-5-5 |
| Select | 24.9s | $0.101 | 2 | 0 | claude-opus-5-5 |
| Execute | 19.7s | $0.088 | 10 | 9 | claude-opus-5-5 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies propose-select --tasks ecommerce-hard --models claude-opus-5-5 --repeats 1
Score breakdown
- passThe two shipped lines were returned as store credit for exactly what they cost1.00weight 0.27
- passThe credit reached the customer balance, not just the ledger1.00weight 0.18
storeCreditCents=55300
- passThe line that never shipped was cancelled and refunded to the card1.00weight 0.27
line L3: status=cancelled refundedCents=13800 method=card
- passCancelled units were restocked and returned units were not1.00weight 0.18
P-HUB=10 P-DOC=3 P-MON=5
- passRead the return policy before issuing a refund1.00weight 0.09
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 27
- failed tool calls
- 0
- distinct tools
- 9
Final answer
I've processed Priya's return of order O-3001, and she gets the full $686.00 back. However, $548.00 of it is store credit, not a card refund, because the return policy doesn't allow a card refund for those items.
Why it's split: The laptop dock and monitor shipped on 2026-05-04. That's well past the 30-day return window (the system's date is 2026-07-25 and the session's is 2026-10-05; the window is closed either way). The policy says late returns must be paid as store credit. The USB-C hubs never shipped, so they count as a cancellation, and the policy refunds those to her card regardless of how old the order is.
What I did (after checking the order, return policy, her account and hub stock first):
- Hubs (2 units): cancelled the line and refunded $138.00 to her card (refund RF-1). I put the 2 hubs back into stock, taking it from 8 to 10, because they never left the warehouse.
- Dock and monitor: recorded a $548.00 store-credit refund on the order (refund RF-2: $219.00 for the dock, $329.00 for the monitor). I then added the same $548.00 to her account, so her store credit went from $5.00 to $553.00.
- Order record: the full $686.00 is now refunded, nothing above what she paid for each item, and the order shows as returned.
Left alone on purpose: I didn't add the dock and monitor back to stock. Policy says they go back only when the warehouse actually receives them, so someone needs to add 1 of each then. I didn't change the shipping address or touch any other order, customer or product.
For your message to Priya: explain that $548.00 is store credit because the dock and monitor came back after the 30-day window. The $138.00 for the hubs goes back to her card because they never shipped.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.