RunOpus 5.5repeat 1
Propose-select on Escalate a payroll outage the requester wants closed
claude-opus-5-5__propose-select__support-hard__r1
Score
1.000
- Cost
- $0.372
- Latency
- 1m 2s
- setup 0.0s, grading 0.0s
- Turns
- 42
- Tool calls
- 36
- Subagents
- 3
- Tokens in / out
- 127k / 9.1k
- 96,389 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- All three proposers ran: heldpropose-select.proposalsThree proposers ran in parallel, each from its own angle, and none was starved while another ran.
- The selector chose: heldpropose-select.selectionThe selector picked a proposal by a valid number, read from its schema reply and not a default.
- Each call was shown the right tools: heldpropose-select.toolsEach proposer was shown the read-only tools, the selector none, and the executor the full toolset.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Proposal 1 (policy-first) | 20.2s | $0.063 | 9 | 8 | claude-opus-5-5 |
| Proposal 2 (state-first) | 24.3s | $0.067 | 10 | 9 | claude-opus-5-5 |
| Proposal 3 (outcome-first) | 21.8s | $0.069 | 10 | 9 | claude-opus-5-5 |
| Select | 14.1s | $0.069 | 2 | 0 | claude-opus-5-5 |
| Execute | 23.5s | $0.104 | 11 | 10 | claude-opus-5-5 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies propose-select --tasks support-hard --models claude-opus-5-5 --repeats 1
Score breakdown
- passSeverity raised to the matrix value for the service and impact scope1.00weight 0.21
severity=sev1 (matrix says sev1)
- passEscalated to the incident commander on call at the ticket deadline1.00weight 0.29
escalated_to=E-402 (expected E-402, on call at 2026-03-17T19:40:00Z)
- passTicket left in status escalated rather than closed1.00weight 0.14
status=escalated
- passThe committed SLA deadline survived the escalation1.00weight 0.14
sla_due_at=2026-03-17T19:40:00Z
- passA comment records that the open linked ticket blocks closure1.00weight 0.14
- passEscalation matrix read before the severity was raised1.00weight 0.07
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 36
- failed tool calls
- 0
- distinct tools
- 8
Final answer
I re-graded T-1070 and escalated it to incident command, but I did not close it. It can't be closed yet because the ticket causing the failure, T-1071, is still open. I checked the ticket, the escalation rules and the on-call schedule again before changing anything, and they matched the plan.
What I did on T-1070:
- Severity raised from sev3 to sev1. The escalation rules grade a company-wide payroll failure as sev1. The grade comes from those rules, not from how urgent the call was.
- Escalated to E-402 Ola Berg on incident command. The rules send sev1 tickets to the incident-command team, and Ola is on call there when the deadline falls at 19:40Z. The ticket's status is now "escalated."
- Deadline left at 2026-03-17T19:40Z. That deadline was already promised to Grace. Recalculating it from the sev1 one-hour target would pull it forward to 10:20Z, which the rules don't allow.
- Not closed. I added a comment for the next shift instead. It names T-1071 (payroll replica lag, the root cause, assigned to E-101) as the blocker and sets out what has to happen: resolve T-1071, rerun the March payroll batch, confirm the payments post, then close.
Different from the plan: the plan said to keep Ines Kovac (E-201) as the assignee. But escalating a ticket automatically makes the receiving engineer the assignee, so T-1070 is now assigned to Ola Berg. My comment notes that Ines is still on call for the payroll team until 20:00Z for the payroll side of the work.
Not touched: T-1071 and all other tickets. I didn't merge T-1070 and T-1071 because they aren't duplicates: T-1071 is the cause and T-1070 is the failed payroll run that resulted from it.
For Grace: T-1070 is now sev1 and with incident command. It can be closed once T-1071 is fixed and the payroll batch has been rerun successfully. If both happen today, it can still be closed today.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.