RunOpus 5.5repeat 1
Propose-select on Run the major-incident runbook for a CI outage
claude-opus-5-5__propose-select__support-major-incident__r1
Score
0.820
- Cost
- $0.867
- Latency
- 2m 1s
- setup 0.0s, grading 0.0s
- Turns
- 126
- Tool calls
- 120
- Subagents
- 3
- Tokens in / out
- 405k / 20k
- 345,236 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- All three proposers ran: heldpropose-select.proposalsThree proposers ran in parallel, each from its own angle, and none was starved while another ran.
- The selector chose: heldpropose-select.selectionThe selector picked a proposal by a valid number, read from its schema reply and not a default.
- Each call was shown the right tools: heldpropose-select.toolsEach proposer was shown the read-only tools, the selector none, and the executor the full toolset.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Proposal 1 (policy-first) | 40.6s | $0.171 | 30 | 29 | claude-opus-5-5 |
| Proposal 2 (state-first) | 50.7s | $0.199 | 31 | 30 | claude-opus-5-5 |
| Proposal 3 (outcome-first) | 56.8s | $0.186 | 30 | 29 | claude-opus-5-5 |
| Select | 19.1s | $0.091 | 2 | 0 | claude-opus-5-5 |
| Execute | 45.0s | $0.220 | 33 | 32 | claude-opus-5-5 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies propose-select --tasks support-major-incident --models claude-opus-5-5 --repeats 1
Score breakdown
- passAn incident is open for the build pipeline1.00weight 0.04
- passThe incident-command engineer on call now commands the incident1.00weight 0.08
commander=E-401 (expected E-401)
- passThe commander was paged1.00weight 0.04
- passT-3101 linked to the incident1.00weight 0.04
- passT-3101 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T18:52:00Z (expected sev1, 2026-03-30T18:52:00Z)
- passT-3102 linked to the incident1.00weight 0.04
- passT-3102 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T18:58:00Z (expected sev1, 2026-03-30T18:58:00Z)
- passT-3103 linked to the incident1.00weight 0.04
- passT-3103 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T19:01:00Z (expected sev1, 2026-03-30T19:01:00Z)
- passT-3104 linked to the incident1.00weight 0.04
- passT-3104 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-31T15:05:00Z (expected sev1, 2026-03-31T15:05:00Z)
- passT-3105 linked to the incident1.00weight 0.04
- passT-3105 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-04-01T15:07:00Z (expected sev1, 2026-04-01T15:07:00Z)
- passT-3106 linked to the incident1.00weight 0.04
- passT-3106 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=new severity=sev1 due=2026-03-30T16:20:00Z (expected sev1, 2026-03-30T16:20:00Z)
- passT-3109 linked to the incident1.00weight 0.04
- passT-3109 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=new severity=sev1 due=2026-03-30T16:20:00Z (expected sev1, 2026-03-30T16:20:00Z)
- failT-3112 linked to the incident0.00weight 0.04
- failT-3112 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=new severity=unset due=- (expected sev1, 2026-03-30T16:20:00Z)
- failT-3113 linked to the incident0.00weight 0.04
- failT-3113 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=open severity=sev3 due=2026-03-31T15:13:00Z (expected sev1, 2026-03-31T15:13:00Z)
- failT-3114 linked to the incident0.00weight 0.04
- failT-3114 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=open severity=sev3 due=2026-03-31T15:16:00Z (expected sev1, 2026-03-31T15:16:00Z)
- passThe engineer covering comms right now is the communications lead1.00weight 0.08
comms=E-803 (expected E-803)
- passA status update in the runbook form, with the next update due within 30 minutes1.00weight 0.08
- passA postmortem ticket for the service, linked to the incident, due at close of business five business days on1.00weight 0.08
T-3115 due=2026-04-08T17:00:00Z
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 120
- failed tool calls
- 0
- distinct tools
- 20
Final answer
I've run the build-pipeline outage as a major incident, INC-1, following the current runbook (KB-40). I didn't use the older KB-39 runbook because it's marked as replaced by KB-40. Before acting I checked the time (Mon 2026-03-30 15:20 UTC), the escalation matrix, the on-call rotas, leave and the business calendar. Everything matched the plan.
- Incident opened: INC-1 for build-pipeline, at 15:20 UTC, before I contacted anyone.
- Commander: I paged Priya Raman (E-401), who is on call for incident-command now and not on leave, and made her incident commander. She is the only person paged.
Reports linked: T-3101, T-3102, T-3103, T-3104, T-3105, T-3106 and T-3109 are all reports of runners being unavailable or jobs never starting.
- Left out: T-3107 (a flaky payments test, reported before the outage began) and T-3108 (a local Xcode build failure). Neither is part of this outage, so I didn't change them.
Severity: all 7 linked tickets are now sev1, which is what the matrix gives a company-wide build-pipeline outage.
- Existing deadlines kept: T-3101 18:52, T-3102 18:58, T-3103 19:01, T-3104 Mar 31 15:05, T-3105 Apr 1 15:07.
- New deadlines: T-3106 and T-3109 had none, so as part of triage they got 15:20 plus the 60-minute sev1 target: 2026-03-30T16:20Z.
- Communications lead: Elif Demir (E-803). The comms rota names Mia Laurent (E-801), but she is on sick leave, so the backup rota (comms-secondary) covers.
- First status update posted to the status page: "Impact: all CI builds company-wide – no build runners available in any pool. Started: 14:52 UTC. Next update: 15:50 UTC." 14:52 is when the first report came in.
- Postmortem ticket: T-3115, linked to INC-1, due 2026-04-08T17:00Z. That's close of business on the 5th business day after the incident opened; Apr 3 (Good Friday), Apr 6 (Easter Monday) and the weekend don't count.
I didn't merge the reports, because the runbook says to link them, and I didn't close anything. T-3106 and T-3109 are still unassigned and their deadline is 16:20. If you want them assigned, Dana Whitfield (E-101) is on call for platform-primary, the rota that owns build-pipeline, at that time. The next status update is due by 15:50 UTC.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.