RunSonnet 5.5repeat 2
Gated-execute on Run the major-incident runbook for a CI outage
claude-sonnet-5-5__gated-execute__support-major-incident__r2
Score
0.820
- Cost
- $0.534
- Latency
- 2m 57s
- setup 0.0s, grading 0.0s
- Turns
- 159
- Tool calls
- 123
- Subagents
- 17
- Tokens in / out
- 499k / 16k
- 405,830 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- Every state change was reviewed: heldgated-execute.reviewedEvery call that changed the world had been allowed by a review before it ran, counted from the world’s own journal.
- Every decision was read: heldgated-execute.decisionsEvery review that ran to its end gave its decision through the schema; an unreadable one is a denial.
- Each call was shown the right tools: heldgated-execute.toolsThe executor was shown the task’s full toolset and each reviewer the read-only tools.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Execute | 2m 57s | $0.116 | 40 | 39 | claude-sonnet-5-5 |
| Review 1: create_incident | 7.0s | $0.019 | 5 | 3 | claude-sonnet-5-5 |
| Review 2: page_engineer | 6.4s | $0.020 | 8 | 6 | claude-sonnet-5-5 |
| Review 3: assign_incident_role | 6.9s | $0.019 | 7 | 5 | claude-sonnet-5-5 |
| Review 4: link_to_incident | 11.5s | $0.041 | 14 | 12 | claude-sonnet-5-5 |
| Review 5: assign_incident_role | 11.8s | $0.035 | 13 | 11 | claude-sonnet-5-5 |
| Review 6: set_severity | 6.6s | $0.020 | 5 | 3 | claude-sonnet-5-5 |
| Review 7: set_severity | 6.1s | $0.019 | 5 | 3 | claude-sonnet-5-5 |
| Review 8: set_severity | 7.5s | $0.020 | 5 | 3 | claude-sonnet-5-5 |
| Review 9: set_severity | 7.6s | $0.022 | 5 | 3 | claude-sonnet-5-5 |
| Review 10: set_severity | 8.4s | $0.019 | 4 | 2 | claude-sonnet-5-5 |
| Review 11: set_severity | 9.9s | $0.023 | 6 | 4 | claude-sonnet-5-5 |
| Review 12: set_severity | 8.5s | $0.027 | 7 | 5 | claude-sonnet-5-5 |
| Review 13: assign_incident_role | 9.7s | $0.029 | 9 | 7 | claude-sonnet-5-5 |
| Review 14: post_status_update | 8.9s | $0.025 | 6 | 4 | claude-sonnet-5-5 |
| Review 15: create_ticket | 10.9s | $0.025 | 6 | 4 | claude-sonnet-5-5 |
| Review 16: extend_sla | 7.4s | $0.024 | 6 | 4 | claude-sonnet-5-5 |
| Review 17: extend_sla | 10.8s | $0.032 | 8 | 6 | claude-sonnet-5-5 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies gated-execute --tasks support-major-incident --models claude-sonnet-5-5 --repeats 1
Score breakdown
- passAn incident is open for the build pipeline1.00weight 0.04
- passThe incident-command engineer on call now commands the incident1.00weight 0.08
commander=E-401 (expected E-401)
- passThe commander was paged1.00weight 0.04
- passT-3101 linked to the incident1.00weight 0.04
- passT-3101 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T18:52:00Z (expected sev1, 2026-03-30T18:52:00Z)
- passT-3102 linked to the incident1.00weight 0.04
- passT-3102 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T18:58:00Z (expected sev1, 2026-03-30T18:58:00Z)
- passT-3103 linked to the incident1.00weight 0.04
- passT-3103 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-30T19:01:00Z (expected sev1, 2026-03-30T19:01:00Z)
- passT-3104 linked to the incident1.00weight 0.04
- passT-3104 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-31T15:05:00Z (expected sev1, 2026-03-31T15:05:00Z)
- passT-3105 linked to the incident1.00weight 0.04
- passT-3105 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-04-01T15:07:00Z (expected sev1, 2026-04-01T15:07:00Z)
- passT-3106 linked to the incident1.00weight 0.04
- passT-3106 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=new severity=sev1 due=2026-03-30T16:20:00Z (expected sev1, 2026-03-30T16:20:00Z)
- passT-3109 linked to the incident1.00weight 0.04
- passT-3109 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=new severity=sev1 due=2026-03-30T16:20:00Z (expected sev1, 2026-03-30T16:20:00Z)
- failT-3112 linked to the incident0.00weight 0.04
- failT-3112 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=new severity=unset due=- (expected sev1, 2026-03-30T16:20:00Z)
- failT-3113 linked to the incident0.00weight 0.04
- failT-3113 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=open severity=sev3 due=2026-03-31T15:13:00Z (expected sev1, 2026-03-31T15:13:00Z)
- failT-3114 linked to the incident0.00weight 0.04
- failT-3114 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=open severity=sev3 due=2026-03-31T15:16:00Z (expected sev1, 2026-03-31T15:16:00Z)
- passThe engineer covering comms right now is the communications lead1.00weight 0.08
comms=E-803 (expected E-803)
- passA status update in the runbook form, with the next update due within 30 minutes1.00weight 0.08
- passA postmortem ticket for the service, linked to the incident, due at close of business five business days on1.00weight 0.08
T-3115 due=2026-04-08T17:00:00Z
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 123
- failed tool calls
- 2
- distinct tools
- 19
Final answer
I opened INC-1 for the company-wide build outage and ran the current major-incident runbook (KB-40) in order. The older runbook KB-39 is marked superseded, so I ignored it.
- Incident: INC-1 is open on build-pipeline.
- Commander: I paged E-401 Priya Raman, the only person paged. She is the incident-command engineer on call right now, and she is now the commander.
- Linked reports: T-3101, T-3102, T-3103, T-3104, T-3105, T-3106 and T-3109 are all reports of the outage and are linked to INC-1.
- Left out: T-3107 is a flaky test and T-3108 is a local Xcode problem, so neither is part of the outage and I didn't touch them.
- Severity: I raised all seven linked reports to sev1. The matrix gives sev1 for company-wide impact on build-pipeline. Existing deadlines are unchanged.
- Missing deadlines: T-3106 and T-3109 had none, so I set them to 16:20 UTC. That is triage time plus the 60-minute sev1 target.
- Comms lead: E-803 Elif Demir. The comms rotation's on-call, E-801 Mia Laurent, is on sick leave today, so the backup rotation (comms-secondary) covers, and E-803 is on call there now. The reviewer first blocked this step because it comes after the severity step in the runbook, so I raised the severities first and then retried.
- Status update: I posted "Impact: All teams company-wide… Started: 14:52 UTC. Next update: 15:45 UTC." The start time is when the earliest report came in.
- Postmortem: T-3115 is linked to INC-1 and due 2026-04-08 at 17:00 UTC. That is the 5th business day after today, skipping the Good Friday (Apr 3) and Easter Monday (Apr 6) holidays.
The next status update is due by 15:45 UTC.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.