RunSonnet 5.5repeat 1
Plan-execute-verify on Run the major-incident runbook for a CI outage
claude-sonnet-5-5__plan-execute-verify__support-major-incident__r1
Score
0.940
- Cost
- $0.452
- Latency
- 2m 22s
- setup 0.0s, grading 0.0s
- Turns
- 121
- Tool calls
- 112
- Subagents
- 0
- Tokens in / out
- 451k / 17k
- 392,979 read from cache
Did the design run?
- Run completed: heldharness.run-completedThe environment was built, the architecture returned and grading finished, none of them throwing.
- No API failures: heldharness.apiNo model call failed at the API.
- Every call ended: heldharness.calls-endedEvery call ended with a result, or was stopped by the run's own limits.
- No harness tool denied: heldharness.harness-toolsThe sandbox guard never denied a harness tool, nor a tool the session itself offered.
- Tool servers connected: heldharness.mcp-connectedEvery tool server the harness gave a call was connected when the session started.
- No foreign tool servers: heldharness.mcp-hermeticNo call loaded a tool server the harness did not give it.
- Builtin tools: heldharness.builtin-toolsA check recorded with the run.
- Structured replies arrived: heldharness.structured-outputEvery call that asked for structured output and ran to the end got it.
- No silent fallbacks: heldharness.not-degradedNo phase fell back on a default (an empty plan, a default winner) instead of its output.
- The plan was a plan: heldplan-execute-verify.planThe planner’s reply was read through its schema and held at least one step.
- Every verdict was read: heldplan-execute-verify.verdictsEvery review round ended with a verdict read from the schema reply, not a default.
- The loop did what its verdicts said: heldplan-execute-verify.loopEvery verdict that called for a revision got one, and nothing was revised without such a verdict.
- Each call was shown the right tools: heldplan-execute-verify.toolsThe planner was shown no tools, the verifier the read-only ones, and the executor and reviser the full toolset.
Phases
Drawn from the phase records: timing and cost per call, no tool calls or messages.
| Phase | Duration | Cost | Turns | Tools | Model |
|---|---|---|---|---|---|
| Plan | 10.5s | $0.015 | 2 | 0 | claude-sonnet-5-5 |
| Execute | 54.2s | $0.188 | 54 | 53 | claude-sonnet-5-5 |
| Verify | 23.4s | $0.074 | 25 | 23 | claude-sonnet-5-5 |
| Revise (round 1) | 14.6s | $0.050 | 11 | 10 | claude-sonnet-5-5 |
| Verify revision 1 | 26.9s | $0.079 | 19 | 17 | claude-sonnet-5-5 |
| Revise (round 2) | 11.9s | $0.045 | 10 | 9 | claude-sonnet-5-5 |
The call-by-call replay is not published for this run. Traces are large, so the repository keeps 9 of this run set’s 900 and leaves the rest out; the score, phases and final answer on this page come from the committed run record.
Runs you can replay
- A gate that blocked the right moveGated-execute · Haiku 4.5
- Three proposals beat one agentPropose-select · Haiku 4.5
- A verifier that earned its keepPlan-execute-verify · Sonnet 5.5
- A revision that did not helpPlan-execute-verify · Haiku 4.5
- The control, missing a stepSingle · Haiku 4.5
Record this cell yourself: npm run bench -- run --strategies plan-execute-verify --tasks support-major-incident --models claude-sonnet-5-5 --repeats 1
Score breakdown
- passAn incident is open for the build pipeline1.00weight 0.04
- passThe incident-command engineer on call now commands the incident1.00weight 0.08
commander=E-401 (expected E-401)
- passThe commander was paged1.00weight 0.04
- passT-3101 linked to the incident1.00weight 0.04
- passT-3101 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=escalated severity=sev1 due=2026-03-30T18:52:00Z (expected sev1, 2026-03-30T18:52:00Z)
- passT-3102 linked to the incident1.00weight 0.04
- passT-3102 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=merged severity=sev1 due=2026-03-30T18:58:00Z (expected sev1, 2026-03-30T18:58:00Z)
- passT-3103 linked to the incident1.00weight 0.04
- passT-3103 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=merged severity=sev1 due=2026-03-30T19:01:00Z (expected sev1, 2026-03-30T19:01:00Z)
- passT-3104 linked to the incident1.00weight 0.04
- passT-3104 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=merged severity=sev1 due=2026-03-31T15:05:00Z (expected sev1, 2026-03-31T15:05:00Z)
- passT-3105 linked to the incident1.00weight 0.04
- passT-3105 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=merged severity=sev1 due=2026-04-01T15:07:00Z (expected sev1, 2026-04-01T15:07:00Z)
- passT-3106 linked to the incident1.00weight 0.04
- failT-3106 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=merged severity=sev1 due=- (expected sev1, 2026-03-30T16:20:00Z)
- passT-3109 linked to the incident1.00weight 0.04
- failT-3109 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=merged severity=sev1 due=- (expected sev1, 2026-03-30T16:20:00Z)
- passT-3112 linked to the incident1.00weight 0.04
- failT-3112 kept open, raised to sev1 with its deadline intact0.00weight 0.02
status=merged severity=sev1 due=- (expected sev1, 2026-03-30T16:20:00Z)
- passT-3113 linked to the incident1.00weight 0.04
- passT-3113 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-31T15:13:00Z (expected sev1, 2026-03-31T15:13:00Z)
- passT-3114 linked to the incident1.00weight 0.04
- passT-3114 kept open, raised to sev1 with its deadline intact1.00weight 0.02
status=open severity=sev1 due=2026-03-31T15:16:00Z (expected sev1, 2026-03-31T15:16:00Z)
- passThe engineer covering comms right now is the communications lead1.00weight 0.08
comms=E-803 (expected E-803)
- passA status update in the runbook form, with the next update due within 30 minutes1.00weight 0.08
- passA postmortem ticket for the service, linked to the incident, due at close of business five business days on1.00weight 0.08
T-3115 due=2026-04-08T17:00:00Z
Penalties
No penalties were applied.
Scorer metadata
- tool calls
- 112
- failed tool calls
- 3
- distinct tools
- 22
Final answer
I fixed issue 1 and left issue 2 alone.
Issue 1 (fixed): The verifier was right. T-3101 was assigned to E-402 Ola Berg, who is only in incident-command. The handbook says the engineer who takes a ticket is on call for the owning rotation, platform-primary, when the deadline falls. At 2026-03-30T18:52Z that is E-101 Dana Whitfield, and she is not on leave. I reassigned T-3101 to E-101. The ticket is still escalated, and escalated_to is still E-402, which is correct for the sev1 routing to incident-command. I changed no other fields. The deadline is still 2026-03-30T18:52Z and severity is still sev1.
Issue 2 (left alone): I did not set a severity on T-3115, because the mistake is in the verifier's reading of the runbook. KB-40 step 4 says to raise every linked report of the outage to sev1. T-3115 is the postmortem task that step 7 creates, not a report. Its due date of 2026-04-08T17:00Z already follows step 7 and would not change either way. Setting sev1 would send a task due in eight days through the outage routing for no benefit. If the desk decides postmortems should be triaged, the matrix value for build-pipeline company-wide is sev1.
Provenance of the numbers on this page
- run set
- scaffold-or-scale-v1
- models
- Haiku 4.5, Sonnet 5.5, Opus 5.5
- effort
- high
- repeats
- 2
- fixtures
- replay
- runs
- 900 / 900
- strategy cost
- $354.44
- judge cost
- $9.19
- wall clock
- 9h 48m
- git
- fce5807b2d
Cost excludes judge calls, which are tracked separately so a scoring model never flatters or penalises an architecture. Every figure on this site is read from results/ at build time.